Research Article
First-Time Application of Underwater Live Concrete for Economic Retrofitting of Damaged Bridge Piers in Bangladesh
Table 1
Details of the extracted cores.
| Si. no. | Core location | Extracted core length, L (mm) | Observed clear cover, C (mm) | Measured diameter of the pile, D (mm) | Pile no. | From bottom of the pile cap, S1 (mm) | From top of water surface, S2 (mm) |
| 1. | P-1 | 660 | 620 | 540 | 120 | – | 2. | P-5 | 680 | 900 | 570 | 75 | – | 3. | P-3 | 380 | 1,330 | 540 | 110 | 1,592 | 4. | P-7 | 560 | 1,280 | 550 | 75 | – | 5. | P-9 | 470 | 900 | 186 | 180 | – | 6. | P-14 | 570 | 1,200 | 500 | 145 | – | 7. | P-11 | 540 | 1,150 | 250 | 80 | 1,640 | 8. | P-16 | 1,000 | 670 | 575 | 100 | – |
|
|