Research Article

Deformation Control of Subway Tunnels Undercrossing Airport Facilities: A Case Study of the Xinzheng Airport Rail Transit Hub Project

Table 3

Numerical model boundary conditions.

Boundary conditionValueBoundary conditionValue

Upper boundary (MPa)2Initial displacement0
Lower boundaryFixedFracture permeability kf (m2)1.17 · 10−12
Left boundaryNo fluxFracture permeability (solidification) kf (m2)0.17 · 10−17
Right boundary