Research Article
Application of BPNN Optimized by Fireworks Algorithm on Structural Bearing Capacity Analysis of Transmission Tower under Icing Conditions
Table 3
Key parameter selection of improved fireworks algorithm.
| Parameter | Parameter description | Parameter value |
| D | Size of firework population | 5 | M | Firework explosion spark number adjustment constant | 8 | Lm | Upper bound of the number of firework explosion sparks | 5 | Bm | Lower bound of the number of firework explosion sparks | 1 | G | Gaussian variation spark number | 5 | T | Maximum iterated algebra | 300 |
|
|