Research Article
Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed Railway
Table 4
The bridge state and the stress difference between the schemes in the process of closure (MPa).
| Construction scheme | Statistical number of beam element stress | SA4-1-1 | SA4-1-2 | SA4-1-3 | SA4-2-1 | SA4-2-2 | SA4-2-3 | SA4-3-1 | SA4-3-2 | SA4-3-3 | SA5-1-1 | SA5-1-2 | SA5-1-3 | A5-2-1 | A5-2-2 |
| | 0.08 | 0.23 | 0.13 | 0.33 | 0.39 | 0.42 | 0.22 | 0.23 | 0.13 | 0.07 | 0.29 | 0.17 | 0.20 | 0.36 |
|
|