Research Article

Closure Scheme Analysis of 3 × 70 m Bearingless Integral Rigid Frame Bridge of Fuzhou Xiamen High-Speed Railway

Table 4

The bridge state and the stress difference between the schemes in the process of closure (MPa).

Construction schemeStatistical number of beam element stress
SA4-1-1SA4-1-2SA4-1-3SA4-2-1SA4-2-2SA4-2-3SA4-3-1SA4-3-2SA4-3-3SA5-1-1SA5-1-2SA5-1-3A5-2-1A5-2-2

0.080.230.130.330.390.420.220.230.130.070.290.170.200.36