Change proportion of the typical section of the upline.

Typical section segment number of the uplineContent of monitoringDisturbance caused by excavation of foundation pit (mm)Disturbance caused by new tunnel tunneling (mm)Proportion of change (%)

S513Vertical displacement−1.3−0.1−92.3
Horizontal displacement1.7−2.4−241.2
Segment convergence1.60.1−93.8
Differential settlement of ballast bed0.50.860.0

S520Vertical displacement−0.80.8−200.0
Horizontal displacement1.7−1.1−164.7
Segment convergence1.70.7−58.8
Differential settlement of ballast bed−0.60.4−166.7

S528Vertical displacement−0.70.7−200.0
Horizontal displacement1.7−1.8−205.9
Segment convergence1.80.4−77.8
Differential settlement of ballast bed0.00.3/