Warning level and feedback method for HBM.
| Item | First level | Second level | Third level |
| Early warning threshold X | Climbing process 1 | 11.3 mm | 18.0 mm | 22.5 mm | Climbing process 2 | 9.4 mm | 15.1 mm | 18.8 mm | Climbing process 3 | 12.8 mm | 20.5 mm | 25.7 mm | Graded scale factor μ | 50% | 80% | 100% | Feedback method | Highlight labeling | Sound and light warning | Shutdown and check |
|
|