Research Article

Selection of Sustainable Building Material Using Multicriteria Decision-Making Model: A Case of Masonry Work in Lideta Subcity, Addis Ababa

Table 5

Summary of main criteria along with their subcriteria (local and global priority).

No.Main criteriaWeight of main criteria (%)SubcriteriaLocal priority (%)Global priority (%)Rank based on GP

1Life cycle cost7.491Initial cost62.894.718
2Maintenance cost23.091.7320
3Disposal cost14.021.0521

2Waste minimization15.064Environmental sound disposal option32.424.887
5Recycling and reuse67.5810.182

3Performance capability20.476Fire resistance28.625.864
7Resistance to decay19.283.9515
8Energy saving and thermal insulation21.934.4910
9Life expectancy (durability)17.713.6216
10Maintainability12.472.5518

4Resource efficiency13.7111Method of raw material extraction25.453.4917
12Amount of wastage in use15.252.0919
13Embodied energies30.184.1413
14Environmental impact during harvest29.123.9914

5Environmental impact19.1115Low toxicity26.795.125
16Ozone depletion26.565.086
17Minimize pollution24.184.629
18Impact on air quality22.464.2912

6Social benefit24.1619Use of local material27.616.673
20Aesthetics18.124.3811
21Health and safety54.2713.111

Total100.00100.00