Research Article

Time-Dependent Fuzzy Reliability Analysis of Concrete Slab during the Initial Water Storage Period of CFRD: A Case Study

Table 2

Parameters calibration results of seven-parameters creep model.

Materialαbfcfdfm1m2m3

Cushion and transition5.7 × 10−38.1 × 10−51.52 × 10−45.14 × 10−40.680.410.55
Upstream rockfill8.1 × 10−35.5 × 10−51.24 × 10−44.92 × 10−40.510.420.43
Downstream rockfill7.2 × 10−37.6 × 10−51.39 × 10−46.06 × 10−40.410.370.48