Simulation Optimization for the Multihoist Scheduling Problem

Table 5

Scenario and data for the MHEDA.

Operations job, precedenceIndexProcessing time window machines (tanks)

1
2
3
4
5
6
7
8
9
10
Tracks2
Hoists2
Transfer time1 (between locations)
Cross time1 (for any machine/tank)
☑ means the machine can process the operation
✗ means the machine does not perform the operation