Research Article

Combining Geoelectrical Measurements and CO2 Analyses to Monitor the Enhanced Bioremediation of Hydrocarbon-Contaminated Soils: A Field Implementation

Table 2

Corrections made to CO2 measurements from April 2014 to April 2015 (February 2014 is the baseline, uncorrected) from gas measuring point number 7.

Apr. 2014May 2014June 2014July 2014Aug. 2014Oct. 2014Dec. 2014Feb. 2015Apr. 2015

Corrections
(µmol·m−2·s−1)
−0.6−1.4−3.05−7.87−9.9−7.65+1.22+1.2−3.27