Research Article

Evaluation of Long-Term Wastewater Treatment Performances in Multi-Soil-Layering Systems in Small Rural Communities

Table 1

Description of the three study sites in small rural communities from July 2012 to June 2013.

IndexSITE 1SITE 2SITE 3

Duration of operation (years)171920
Total pipeline length (m)882701425
Number of associated users302435
Top area of MSL system (m2)198139173
Mean water consumption in each community (m3·day−1)5.964.848.76
Loading rate in MSL system (m3·m−2·day−1)0.0300.0350.051
Operation period of MSLMay–Oct.May–Oct.All year round