Review Article

Current Direct Neutrino Mass Experiments

Figure 23

Photographs of the oil- and dust-free scaffold to install the wire electrode system in the main spectrometer (a) and view into the main spectrometer before the last two wire electrode modules at one of the pump ports were installed to finish the wire electrode installation (b). Photographs: Michael Zacher.
293986.fig.0023a
(a)
293986.fig.0023b
(b)