Research Article
The Opportunity Offered by the ESSnuSB Project to Exploit the Larger Leptonic CP Violation Signal at the Second Oscillation Maximum and the Requirements of This Project on the ESS Accelerator Complex
Figure 14
Evolution of maximum foil temperatures [K] at the spot peak (dashed) and the combined and circulating protons peak (red). Two injections into the accumulator per linac pulse.