Evaluation of the Contribution of Deposited Precipitation
Table 2
Evaluation of precipitation amount at the Poledník and Smědava localities (year 2013).
Characteristic
Poledník
Smědava
Month
Month
VIII.
IX.
X.
Total
VIII.
IX.
Total
DP [mm]
0.1
3.0
2.2
5.3
1.7
1.5
3.2
FP [mm]
0.3
137.7
52.1
190.1
19.6
163.6
183.2
DDP
1
11
7
19
6
5
11
DM
2
30
15
47
15
16
31
DP/FP [%]
—
2.2
4.2
2.7
8.7
0.9
1.7
DP
Per day
0.057
0.099
0.145
0.112
0.112
0.094
0.103
Per DP day
0.113
0.269
0.311
0.276
0.281
0.299
0.289
FP
Per day
0.150
4.590
3.473
4.045
1.307
10.225
5.910
DP: deposited precipitation amount. FP: falling precipitation amount. DDP: number of days with deposited precipitation. DM: number of days with measurement.