Research Article
A New Vortex Initialization Scheme Coupled with WRF-ARW
Table 5
Comparisons of our scheme with other schemes.
| Metrics\schemes | Xiao et al. [10] | Kwon and Cheong [7] | Hsiao et al. [11] | Cha and Wang [12] | Our scheme |
| 24 h track | — | — | 208 | — | 69.7 | 48 h track | — | 173.9 | 95 | — | 103.4 | 72 h track | — | — | 312 | — | 163.4 | MAE of track | 110 | — | — | 103.3 | 114.2 |
| 24 h CSLP | — | 11.2 | — | — | 9.2 | 48 h CSLP | — | 10.0 | — | — | 15.0 | MAE of CSLP | 17 | — | — | — | 11.6 |
| MAE of MWSP | 9 | — | — | 7.3 | 5.7 |
|
|