Research Article

Analysis of Wind Data, Calculation of Energy Yield Potential, and Micrositing Application with WAsP

Table 6

Turbine establishment cost [20ā€“26].

Establishment parametersCost (ā‚¬)

Turbine and installation9.000.000
Project preparation costs (permission and licences)650.000
Land rental cost100.000
Network connections (cable, transformer, and communication)1.800.000
Foundation and installation (foundation, road, and site)1.200.000
Finance (consultancy, insurance, and bank)450.000
Total13.200.000