Research Article
Analysis of Wind Data, Calculation of Energy Yield Potential, and Micrositing Application with WAsP
Table 6
Turbine establishment cost [
20ā
26].
| Establishment parameters | Cost (ā¬) |
| Turbine and installation | 9.000.000 | Project preparation costs (permission and licences) | 650.000 | Land rental cost | 100.000 | Network connections (cable, transformer, and communication) | 1.800.000 | Foundation and installation (foundation, road, and site) | 1.200.000 | Finance (consultancy, insurance, and bank) | 450.000 | Total | 13.200.000 |
|
|