Research Article

On One Approach to TSP Structural Stability

Table 1

The comparison of tour costs obtained by CI and by Algorithm 3 for different TSPLIB [19] instances; is the cost of the optimal solution; is the cost of the CI-tour; the remaining columns present the values of (in percent), where is obtained by Algorithm 3 with the correspondent and .

Name

75429241102.9108.7105.997.5102.399.7100.7
65287729100.795.696.7100.6104.499.7100
25793052101.194.5102.396.296.398101.5
67797693103101.999.599.198.599100.3