Typical maintenance checks, adapted from Eurocontrol [4].

CheckLocationDescriptionDuration

LineAt gateDaily (before the first flight or when in transit). Visual inspection; fluid levels; tires and brakes; emergency equipment~1 hour

AAt gateRoutine light maintenance; engine inspection~10 hours

BAt gateSimilar to A check but with different tasks (may occur between consecutive A checks)~10 hours to ~1 day

CHangarStructural inspection of airframe, opening access panels; routine and nonroutine maintenance; run-in tests~3 days to ~1 week

DHangarMajor structural inspection of the airframe after paint removal; engines, landing gear, and flaps removed; instruments, electronic and electrical equipment removed; interior fittings removed; hydraulic and pneumatic components removed~1 month

We are committed to sharing findings related to COVID-19 as quickly as possible. We will be providing unlimited waivers of publication charges for accepted research articles as well as case reports and case series related to COVID-19. Review articles are excluded from this waiver policy. Sign up here as a reviewer to help fast-track new submissions.