Resource Tardiness Weighted Cost Minimization in Project Scheduling

Table 4

Number of instances of each set of group IV out of 20 solved to optimality in 10 seconds by the branch and bound algorithm and the CPLEX solver.

Instance set# instances solved by the CPLEX solver# instances solved by the branch and bound algorithm

First additional set319
Base set719
Second additional set1618