Research Article
Stochastic P-Robust Approach to a Centralized Two-Stage DEA System with Resource Waste
Table 13
The gap values of model (
14).
| | (0.3, 0.7) | (0.6, 0.4) | (0.2, 0.8) | DMUs |
| 1 | 0.635 | 0.659 | 0.647 | 2 | 0.551 | 0.575 | 0.563 | 3 | 0.746 | 0.770 | 0.758 | 4 | 0.492 | 0.516 | 0.504 | 5 | 0.756 | 0.780 | 0.768 | 6 | 0.520 | 0.544 | 0.532 | 7 | 0.691 | 0.715 | 0.703 | 8 | 0.550 | 0.574 | 0.562 | 9 | 0.465 | 0.489 | 0.477 | 10 | 0.822 | 0.846 | 0.834 | 11 | 0.726 | 0.750 | 0.738 |
|
|