Anesthesiology Research and Practice / 2011 / Article / Fig 7

Clinical Study

Successful Implementation of a Perioperative Glycemic Control Protocol in Cardiac Surgery: Barrier Analysis and Intervention Using Lean Six Sigma

Figure 7

Time to control (retrospective data analysis). Box-and-whisker plot represents time to control (mg/dL) by phase. *P < 0.05 and **P < 0.01 (versus baseline) and P < 0.05 and ††P < 0.01 (versus final phase).
565069.fig.007

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.