Research Article
Start-Up and Aeration Strategies for a Completely Autotrophic Nitrogen Removal Process in an SBR
Table 1
Operating parameters of each phase in SBR.
| Parameters | Phase A | Phase B |
| Time range (d) | 0~50 | 51~140 |
| Hydraulic retention time (h) | 16 | 24 (51~123 days), 16 (124~140 days) |
| Aeration mode | Continuous | Intermittent (2 h aeration : 2 h no aeration : 2 h aeration : 1.5 h no aeration) |
| DO concentration during aeration phase | 1~2 mg/L (1~11 days), 0.16~0.18 mg/L (12~51 days) | 0.04~0.15 mg/L (aeration time), 0 mg/L (no aeration time) |
| Intermittent aeration (R) | — | 1/1 (except the last nonaeration duration) |
|
|