Impression taking(i) HA removal (1 min)
(ii) Intraoral scan (15 min)
(iii) Colour determination (3 min)
(iv) HA re-insertion (1 min)
Total = 20 (± 5) min
  
Active working time = 20 (± 5) min
(first impression)
(i) HA removal (1 min)
(ii) Impression taking (20 min)
(iii) Colour determination (3 min)
(iv) HA re-insertion (1 min)
Total = 25 (± 5) min
  
(second impression)
(i) resin crown removal (1 min)
(ii) Metal coping placement (1 min)
(iii) Impression taking (20 min)
(iv) resin crown re-cementation (3 min)
Total = 25 (± 4) min
  
Active working time= 50 min (± 7)
<.0001

Production of the temporary crown(i) CAD of the individual abutment (30 min)
(ii) CAD of the crown (25 min)
(iii) Milling of the zirconia abutment (25 min)
(iv) Sinterization of the zirconia abutment (480 min)
(v) Milling of the PMMA crown (25 min)
(vi) Polishing and characterization of the PMMA crown (5 min)
(vii) Assembly of the individual hybrid abutment (10 min)
Total = 600 min (± 45)
  
Active working time = 70 min (± 15 min)
(i) Preparation of the temporary resin crown (120 min)
(ii) Polishing and characterization of the temporary resin crown (20 min)
(iii) Preparation of the metal coping (180 min)
(iv) polishing of the metal coping (20 min)
Total = 340 min (± 37)
  
Active working time = 340 min (± 37)
0.0001

Delivery of the temporary crown(i) HA removal (1 min)
(ii) Insertion and activation of the individual hybrid abutment (5 min)
(iii) Delivery and cementation of the temporary crown (5 min)
Total = 11 min (± 5)
  
Active working time = 11 min (± 5)
(i) HA removal (1 min)
(ii) Insertion and activation of the titanium abutment (3 min)
3. Delivery and cementation of the temporary crown (5 min)
Total = 9 min (± 4)
  
Active working time = 9 min (± 4)
0.5

Preparation of the final crown(i) CAD of the final crown (10 min)
(ii) milling of the final translucent zirconia crown (25 min)
(iii) sinterization of the final translucent zirconia crown (480 min)
(iv)characterization of the final translucent zirconia crown (10 min)
Total = 525 min (± 39)
  
Active working time = 25 min (± 9 min)
(i) Preparation of the metal-ceramic crown (240 min)
(ii) Polishing of the metal-ceramic crown (20 min)
Total = 260 min (± 26)
  
Active working time = 260 min (± 26)
<0.0001

Delivery of the final crown(i) Removal of the temporary crown (2 min)
(ii) Placement, adjustments, and final cementation of the monolithic translucent zirconia crown (12 min)
Total = 14 min (± 5)
  
Active working time = 14 min (± 5)
(i) Removal of the temporary crown (2 min)
(ii) Placement, adjustments, and final cementation of the metal-ceramic crown (10 min)
Total = 12 min (± 5)
  
Active working time = 12 min (± 5)
0.5

= Student’s t-test for independent samples.
for the analog procedure, two impressions are regularly taken, one with the transfer and the other with the metal coping in position.