Research Article

Optimizing the Shunting Schedule of Electric Multiple Units Depot Using an Enhanced Particle Swarm Optimization Algorithm

Table 4

Computational results.

EMU numberStaying time on inspection track (minutes)Staying time on washing track (minutes)Number of shunting movements

EMU 1186602
EMU 2218652
EMU 31502712
EMU 4154622
EMU 5162613
EMU 61551202
EMU 7160602
EMU 8211601
ā€‰Avg. = 174.5Avg. = 94.9Avg. = 2
ā€‰Sum = 16