Research Article

Risk Evaluation Model of Highway Tunnel Portal Construction Based on BP Fuzzy Neural Network

Table 1

The input data of Tunnel 1.

X1X2X3X4X5X6X7X8X9X10X11X12X13X14X15X16X17X18X19X20X21X22X23X24X25X26X27X28

0.1360.2000.3440.3600.3280.2560.3440.3600.2560.2800.3520.3600.2320.3600.1680.2240.3360.2800.2800.2080.3280.3600.3600.3600.3280.2960.3040.288