Research Article
Risk Evaluation Model of Highway Tunnel Portal Construction Based on BP Fuzzy Neural Network
Table 8
Comparison of evaluation methods.
| Evaluation target | BP fuzzy neural network method | FAHP method |
| Risk result | (0.0000, 0.0000, 0.0084, 0.9403, 0.0513) | (0.0126, 0.2332, 0.2608, 0.3798, 0.1134) | Risk level | IV (high risk) | IV (high risk) |
|
|