CODE | Name | FAII | Rank 1 | ANP | Rank 2↓ |
|
C2H1 | Lack of company’s safety policy | 0.28753 | 19 | 0.271236 | 1 |
C2H2 | Insufficient safety training | 0.40116 | 1 | 0.080684 | 2 |
C10H2 | Failure in enforcing, motivating, and training workers to use PPE | 0.32259 | 7 | 0.074344 | 3 |
C1H2 | No housekeeping (scattered garbage and material, dusts, excessive noise, vibration, etc.) | 0.33981 | 5 | 0.054578 | 4 |
C2H3 | Insufficient safety motivation and incentives | 0.39506 | 2 | 0.052904 | 5 |
C9H3 | Failure to use required PPE (fall arrest systems) and safety nets | 0.34568 | 4 | 0.051955 | 6 |
C2H4 | Negative management attitude to safety | 0.38752 | 3 | 0.03552 | 7 |
C9H2 | Falling of hand tools and other materials | 0.32693 | 6 | 0.032775 | 8 |
C14H2 | Failure to locate underground services and to take precautionary measures | 0.31173 | 11 | 0.031273 | 9 |
C11H2 | Failure in enforcing traffic regulations (seat belt, speed limit, license, and training) | 0.30476 | 13 | 0.0285 | 10 |
C13H4 | Failure in storage of flammable liquids and combustible materials | 0.31005 | 12 | 0.027115 | 11 |
C6H3 | Lack of safe working load indicator/inspection stickers/latches/barricades | 0.31981 | 8 | 0.02209 | 12 |
C9H1 | Failure to place adequate barriers and warning signs for open edges and holes | 0.31855 | 9 | 0.019644 | 13 |
C4H2 | Lack of special PPE (personal protective equipment), such as face shield, special gloves, and goggles for welding/cutting | 0.31741 | 10 | 0.019333 | 14 |
C7H1 | Unsafe installation of the temporary power (old, damaged, and wrong rating of panels, sockets, wires, etc.) | 0.2758 | 24 | 0.018633 | 15 |
C8H3 | Use or operation by untrained and unauthorized operators (lack of training system) | 0.29729 | 15 | 0.01509 | 16 |
C10H1 | Failure to provide appropriate and adequate personal protective equipment for workers (head, eye, face, hand, foot, and hearing protection) | 0.28235 | 20 | 0.014869 | 17 |
C13H3 | Fire extinguishers are not enough, not in proper locations, not accessible, and not regularly maintained | 0.29127 | 17 | 0.014117 | 18 |
C14H3 | Lack of proper barriers/warning signs/lights for the excavation | 0.28929 | 18 | 0.01344 | 19 |
C3H2 | Unsafe storage/stacking of materials and exceeding safe loading limits | 0.29321 | 16 | 0.012805 | 20 |
C1H1 | Insufficient working spaces/wrong site layout/no access/no lights | 0.28045 | 22 | 0.012462 | 21 |
C7H2 | Failure to apply access limit, lockout tag-out, permit system, and signage systems | 0.26612 | 26 | 0.011738 | 22 |
C12H3 | Inadequate scaffolding stability (guardrails, toe boards, secured ties, etc.) | 0.2809 | 21 | 0.009772 | 23 |
C9H4 | Unsafe access to high places by damaged ladders, lifts, etc. | 0.30041 | 14 | 0.008982 | 24 |
C7H3 | Lack of inspection for the electric tools, cables, and equipment | 0.26452 | 27 | 0.007395 | 25 |
C6H2 | Lack of licensed trained riggers and operators | 0.27984 | 23 | 0.005696 | 26 |
C1H3 | Insufficient food, drinking water, toilets, rest shelters, and medical facilities | 0.26155 | 29 | 0.005691 | 27 |
C13H2 | Failure in controlling of ignition sources and fire watches, fire blankets, etc. | 0.26296 | 28 | 0.005473 | 28 |
C5H1 | Failure to perform form works under the supervision of a competent person | 0.21498 | 39 | 0.005426 | 29 |
C12H4 | Failure to provide safe access against slipping, sliding, or falling | 0.27511 | 25 | 0.005256 | 30 |
C11H1 | Vehicles (buses/pickups/trucks/others) are in bad condition and do not have regular maintenance/first aid equipment/fire extinguishers/lights | 0.25774 | 31 | 0.00475 | 31 |
C4H3 | Welders without training, license, and certificates | 0.2516 | 34 | 0.003663 | 32 |
C14H1 | Wrong procedures (with slab, timber, trench, boxes, shoring, lining, etc.) | 0.25274 | 33 | 0.003465 | 33 |
C8H2 | Use of tools other than its intended use | 0.24863 | 35 | 0.00301 | 34 |
C13H1 | Lack of fire extinguishing training, escape plans, and drills | 0.25591 | 32 | 0.002861 | 35 |
C5H2 | Use of weak and deformed forms | 0.19334 | 42 | 0.002713 | 36 |
C6H1 | Unavailability of a safe lift plan on-site | 0.25873 | 30 | 0.002448 | 37 |
C3H1 | Lack of proper planning and workforce for storage | 0.20988 | 40 | 0.001829 | 38 |
C12H2 | Lack of proper design, workmanship, and regular inspections | 0.23285 | 36 | 0.001809 | 39 |
C8H1 | Tools are in bad condition with no regular inspection | 0.21674 | 38 | 0.001801 | 40 |
C4H1 | Failure in handling, inspection, and maintenance of equipment (cylinders, machines, hoses, and cables) | 0.19444 | 41 | 0.00162 | 41 |
C12H1 | Use of defective and worn fasteners, components, settings, and material in scaffolding system | 0.23167 | 37 | 0.001233 | 42 |
|