Research Article
Multiobjective Sizing of an Autonomous Hybrid Microgrid Using a Multimodal Delayed PSO Algorithm: A Case Study of a Fishing Village
Table 4
Optimal results obtained.
| Location | Parameters | PV/WT/DG/battery |
| Essaouira (Morocco) | Number of iterations | 200 | Number of particles | 100 | Number PV panels | 15 | Days of autonomy | 5 | Number of WTs | 1 | DG capacity (kW) | 4 | LPSP (%) | 0.12 | LCOE ($/kWh) | 0.17 | REF (%) | 90 |
|
|