Research Article

Path Optimization along Buoys Based on the Shortest Path Tree with Uncertain Atmospheric and Oceanographic Data

Table 2

The first route.

No.LongitudeLatitudeDistance between adjacent buoys (m)

404118°04.0′E24°24.8′N1864
Q2-1118°04.5′E24°23.9′N4364
Q1-1118°06.4′E24°22.3′N8265
106118°08.8′E24°18.4′N1781
104118°09.7′E24°17.9′N1643
102118°10.3′E24°17.2′N5897
8118°13.7′E24°16.5′N3287
6118°14.9′E24°15.1′N7616
Xiamen Gang Kou118°17.6′E24°11.8′N