Research Article
[Retracted] Positioning of Prefabricated Building Components Based on BIM and Laser Image Scanning Technology in the Environment of Internet of Things
Table 2
Lifting efficiency and moving speed results of different groups.
| Group | Hoisting efficiency (u/min) | Moving rate (m/s) | Maximum | Minimum | Average |
| Artificial group | 0.621 | 2.25 | 0.17 | 1.08 | Intelligent positioning group | 0.934 | 2.84 | 0.93 | 1.46 | t | 1.267 | 8.029 | 2.284 | 3.691 | | 0.008 | 0.006 | 0.007 | 0.006 |
|
|