479268.fig.006a
(a)
479268.fig.006b
(b)
479268.fig.006c
(c)
479268.fig.006d
(d)
Figure 6: Two samples showing performance of the proposed method. The green line shows the BM boundary and the red line indicates the SCI boundary.