Research Article
A Data-Driven Hybrid Three-Stage Framework for Hospital Bed Allocation: A Case Study in a Large Tertiary Hospital in China
Table 11
Relationship between beds and BOR in W6.
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Note. The higher the R2, the better the function model. When the W6 model is fitted, it has the same outcome as W9. The quadratic curve is also selected. The bed number of W6 is C3, and the bed rate is BOR3 (C3). According to the estimated value of the parameter, . |