Table of Contents Author Guidelines Submit a Manuscript
Complexity
Volume 2017, Article ID 2017634, 11 pages
https://doi.org/10.1155/2017/2017634
Research Article

Fuzzy Control Model and Simulation for Nonlinear Supply Chain System with Lead Times

1School of Logistics, Linyi University, Linyi 276005, China
2School of Economics and Management, Tongji University, Shanghai 200092, China
3Faculty of Business and Economics, The University of Melbourne, Melbourne, VIC 3010, Australia
4Library, Linyi University, Linyi 276005, China

Correspondence should be addressed to Songtao Zhang; moc.361@6260tsz

Received 18 February 2017; Revised 4 June 2017; Accepted 13 August 2017; Published 14 September 2017

Academic Editor: Pietro De Lellis

Copyright © 2017 Songtao Zhang et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. K. Zimmer, “Supply chain coordination with uncertain just-in-time delivery,” International Journal of Production Economics, vol. 77, no. 1, pp. 1–15, 2002. View at Publisher · View at Google Scholar · View at Scopus
  2. G. Zhang, J. Shang, and W. Li, “Collaborative production planning of supply chain under price and demand uncertainty,” European Journal of Operational Research, vol. 215, no. 3, pp. 590–603, 2011. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  3. S. Park, T.-E. Lee, and C. S. Sung, “A three-level supply chain network design model with risk-pooling and lead times,” Transportation Research Part E: Logistics and Transportation Review, vol. 46, no. 5, pp. 563–581, 2010. View at Publisher · View at Google Scholar · View at Scopus
  4. R. J. Tersine and E. A. Hummingbird, “Lead-time reduction: the search for competitive advantage,” International Journal of Operations and Production Management, vol. 15, no. 2, pp. 8–18, 1995. View at Publisher · View at Google Scholar · View at Scopus
  5. S. Mahajan and V. Venugopal, “Value of information sharing and lead time reduction in a supply chain with autocorrelated demand,” Technology Operation Management, vol. 2, no. 1, pp. 39–49, 2011. View at Publisher · View at Google Scholar
  6. M. Leng and M. Parlar, “Lead-time reduction in a two-level supply chain: non-cooperative equilibria vs. coordination with a profit-sharing contract,” International Journal of Production Economics, vol. 118, no. 2, pp. 521–544, 2009. View at Publisher · View at Google Scholar · View at Scopus
  7. Y. Li, X. J. Xu, and F. Ye, “Supply chain coordination model with controllable lead time and service level constraint,” Computers Industrial Engineering, vol. 61, no. 3, pp. 858–864, 2011. View at Google Scholar
  8. C. H. Glock, “Lead time reduction strategies in a single-vendorsingle-buyer integrated inventory model with lot size-dependent lead times and stochastic demand,” International Journal of Production Economics, vol. 136, no. 1, pp. 37–44, 2012. View at Publisher · View at Google Scholar · View at Scopus
  9. J. K. Jha and K. Shanker, “An integrated inventory problem with transportation in a divergent supply chain under service level constraint,” Journal of Manufacturing Systems, vol. 33, no. 4, pp. 462–475, 2014. View at Publisher · View at Google Scholar · View at Scopus
  10. J. Heydari, “Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination,” Transportation Research Part E: Logistics and Transportation Review, vol. 63, pp. 44–58, 2014. View at Publisher · View at Google Scholar · View at Scopus
  11. C. A. Garcia, A. Ibeas, J. Herrera, and R. Vilanova, “Inventory control for the supply chain: An adaptive control approach based on the identification of the lead-time,” Omega, vol. 40, no. 3, pp. 314–327, 2012. View at Publisher · View at Google Scholar · View at Scopus
  12. H. Xu and G. Rong, “A minimum variance control theory perspective on supply chain lead time uncertainty,” Industrial and Engineering Chemistry Research, vol. 51, no. 27, pp. 9275–9286, 2012. View at Publisher · View at Google Scholar · View at Scopus
  13. A. A. Taleizadeh, S. T. A. Niaki, N. Shafii, R. G. Meibodi, and A. Jabbarzadeh, “A particle swarm optimization approach for constraint joint single buyer-single vendor inventory problem with changeable lead time and (r,Q) policy in supply chain,” International Journal of Advanced Manufacturing Technology, vol. 51, no. 9–12, pp. 1209–1223, 2010. View at Publisher · View at Google Scholar · View at Scopus
  14. C. Li and S. Liu, “A robust optimization approach to reduce the bullwhip effect of supply chains with vendor order placement lead time delays in an uncertain environment,” Applied Mathematical Modelling. Simulation and Computation for Engineering and Environmental Systems, vol. 37, no. 3, pp. 707–718, 2013. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  15. C. A. Garcia, A. Ibeas, R. Vilanova, and J. Herrera, “Lead-time identification for inventory control of the supply chain,” in Proceedings of the 20th Mediterranean Conference on Control & Automation, pp. 728–733, Barcelona, Spain, July 2012.
  16. X.-J. Han, A.-M. Feng, and B.-L. Zhang, “Approximate optimal inventory control of supply chain networks with lead time,” in Proceedings of the 27th Chinese Control and Decision Conference, CCDC 2015, pp. 4523–4528, May 2015. View at Publisher · View at Google Scholar · View at Scopus
  17. K. K. Movahed and Z.-H. Zhang, “Robust design of (s,S) inventory policy parameters in supply chains with demand and lead time uncertainties,” International Journal of Systems Science. Principles and Applications of Systems and Integration, vol. 46, no. 12, pp. 2258–2268, 2015. View at Publisher · View at Google Scholar · View at MathSciNet
  18. X. Wang and S. M. Disney, “Mitigating variance amplification under stochastic lead-time: the proportional control approach,” European Journal of Operational Research, vol. 256, no. 1, pp. 151–162, 2017. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  19. H. J. Lee, J. B. Park, and G. Chen, “Robust fuzzy control of nonlinear systems with parametric uncertainties,” IEEE Transactions on Fuzzy Systems, vol. 9, no. 2, pp. 369–379, 2001. View at Publisher · View at Google Scholar · View at Scopus
  20. H. Yang and J. Zhao, “Robust control for a class of uncertain switched fuzzy systems,” Journal of Control Theory and Applications, vol. 5, no. 2, pp. 184–188, 2007. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  21. Y. Cui, K. Liu, Y. Zhao, and X. Wang, “Robust H∞ control for a class of uncertain switched fuzzy time-delay systems based on T-S models,” Mathematical Problems in Engineering, vol. 2013, Article ID 234612, 2013. View at Publisher · View at Google Scholar · View at Scopus
  22. L. Teng, Y. Wang, W. Cai, and H. Li, “Robust model predictive control of discrete nonlinear systems with time delays and disturbances via T–S fuzzy approach,” Journal of Process Control, vol. 53, pp. 70–79, 2017. View at Publisher · View at Google Scholar · View at Scopus
  23. Qi. Ruiyun, T. Gang, B. Jiang, and C. Tan, “Adaptive control schemes for discrete-time T-S fuzzy systems with unknown parameters and actuator failures,” in Proceedings of the 2011 American Control Conference, pp. 3748–3753, San Francisco, CA, USA, June 2011. View at Publisher · View at Google Scholar
  24. C. M. Li and X. M. Tian, “Control based on LMIs for a class of time-delay switched system,” Journal of Measurement Science & Instrumentation, vol. 1, no. 3, pp. 293–296, 2010. View at Google Scholar
  25. X. D. Liu and Q. L. Zhang, “Approaches to quadratic stability conditions and H∞ control designs for T-S fuzzy systems,” IEEE Transactions on Fuzzy Systems, vol. 11, no. 6, pp. 830–839, 2003. View at Publisher · View at Google Scholar · View at Scopus
  26. Z.-H. Xiu and G. Ren, “Stability analysis and systematic design of Takagi-Sugeno fuzzy control systems,” Fuzzy Sets and Systems. An International Journal in Information Science and Engineering, vol. 151, no. 1, pp. 119–138, 2005. View at Publisher · View at Google Scholar · View at MathSciNet · View at Scopus
  27. X. P. Guan and C. L. Chen, “Delay-dependent guaranteed cost control for T-S fuzzy systems with time delays,” IEEE Transactions on Fuzzy Systems, vol. 12, no. 2, pp. 236–249, 2004. View at Publisher · View at Google Scholar · View at Scopus
  28. S. Zhang, Y. Hou, and X. Zhao, “Robust stabilization for discrete uncertain Takagi-Sugeno fuzzy systems based on a piecewise Lyapunov function,” Industrial and Engineering Chemistry Research, vol. 53, no. 17, pp. 7132–7140, 2014. View at Publisher · View at Google Scholar · View at Scopus
  29. S. Zhang, X. Li, and C. Zhang, “A fuzzy control model for restraint of bullwhip effect in uncertain closed-loop supply chain with hybrid recycling channels,” IEEE Transactions on Fuzzy Systems, vol. 25, no. 2, pp. 475–482, 2017. View at Publisher · View at Google Scholar
  30. B. Zhang and S. Xu, “Delay-Dependent Robust H∞ control for uncertain discrete-time fuzzy systems with time-varying delays,” IEEE Transactions on Fuzzy Systems, vol. 17, no. 4, pp. 809–823, 2009. View at Publisher · View at Google Scholar · View at Scopus