Mean values of the percentage of works groups in the total offered value.
| Number | Group of works | Mean value of the percentage of works groups in the total offered price [%] |
| (1) | Roadway construction and landscaping works | 68 | (2) | Earthworks | 14 | (3) | Preparation works | 12 | (4) | Other works | 3 | (5) | Drainage works | 2 | (6) | Works on traffic signals installation | 1 |
|
|