Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM

Table 10

SVM models (min-max).

ModelεMAPE training
(cost) [%]
MAPE training (duration) [%]MAPE testing (cost) [%]MAPE testing (duration) [%]

SVM 1200.0010.08325.28/15.47/
SVM 2200.0010.09123.96/7.06/
SVM 3200.0010.083/29.21/24.59
SVM 4200.0010.091/30.75/22.77