Research Article
Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM
Table 11
PE for estimation of costs, testing set.
| | Expected cost [RSD] | PE for the cost for the model testing [%] | | ANN 1 | ANN 2 | ANN 3 | ANN 4 | SVM 1 | SVM 2 |
| (1) | 2.648.222,52 | −102.64 | 50.14 | 7.02 | −22.16 | 35.13 | 29.26 | (2) | 3.745.996,06 | −135.49 | 24.81 | −64.12 | −6.85 | 10.90 | 2.95 | (3) | 4.316.450,20 | −71.75 | −3.35 | −58.63 | −4.19 | 3.30 | −3.69 | (4) | 4.406.745,87 | −8.84 | −28.48 | −26.43 | 43.85 | −101.06 | −17.16 | (5) | 5.894.577,64 | −61.60 | −56.76 | −30.47 | −71.95 | 6.58 | −6.68 | (6) | 6.228.262,97 | 108.17 | 61.10 | 58.49 | 70.07 | −0.36 | 11.47 | (7) | 7.959.531,14 | −8.24 | −22.17 | −26.71 | −45.93 | −21.82 | −14.67 | (8) | 14.402.129,26 | −25.13 | −10.58 | 12.93 | 27.89 | −31.66 | 3.81 | (9) | 15.499.081,98 | −33.01 | −15.10 | −25.31 | −23.05 | 6.85 | 6.93 | (10) | 24.298.158,68 | −11.78 | 55.89 | −11.72 | −5.09 | −6.95 | 2.46 | (11) | 29.293.376,43 | −6.23 | −1.86 | −2.24 | −18.82 | 0.25 | 0.19 | (12) | 31.331.583,69 | −22.66 | −17.92 | −9.52 | −23.11 | −6.58 | −3.87 | (13) | 48.628.946,36 | −12.12 | −37.33 | 4.69 | 6.09 | −4.72 | 2.68 | (14) | 68.428.523,13 | −61.68 | −25.73 | −58.10 | −51.68 | −13.91 | −6.86 | (15) | 74.828.211,00 | 8.16 | 25.96 | 7.08 | 4.65 | 7.95 | 4.28 | (16) | 121.971.479,98 | 6.97 | 11.85 | 26.16 | 30.90 | 2.68 | 1.90 | (17) | 267.333.894,15 | −4.63 | −9.51 | −1.91 | −0.62 | −2.31 | −1.21 | MAPE | 40.54 | 26.97 | 25.38 | 26.88 | 15.47 | 7.06 |
|
|