Research Article

Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM

Table 11

PE for estimation of costs, testing set.

Expected cost [RSD]PE for the cost for the model testing [%]
ANN 1ANN 2ANN 3ANN 4SVM 1SVM 2

(1)2.648.222,52−102.6450.147.02−22.1635.1329.26
(2)3.745.996,06−135.4924.81−64.12−6.8510.902.95
(3)4.316.450,20−71.75−3.35−58.63−4.193.30−3.69
(4)4.406.745,87−8.84−28.48−26.4343.85−101.06−17.16
(5)5.894.577,64−61.60−56.76−30.47−71.956.58−6.68
(6)6.228.262,97108.1761.1058.4970.07−0.3611.47
(7)7.959.531,14−8.24−22.17−26.71−45.93−21.82−14.67
(8)14.402.129,26−25.13−10.5812.9327.89−31.663.81
(9)15.499.081,98−33.01−15.10−25.31−23.056.856.93
(10)24.298.158,68−11.7855.89−11.72−5.09−6.952.46
(11)29.293.376,43−6.23−1.86−2.24−18.820.250.19
(12)31.331.583,69−22.66−17.92−9.52−23.11−6.58−3.87
(13)48.628.946,36−12.12−37.334.696.09−4.722.68
(14)68.428.523,13−61.68−25.73−58.10−51.68−13.91−6.86
(15)74.828.211,008.1625.967.084.657.954.28
(16)121.971.479,986.9711.8526.1630.902.681.90
(17)267.333.894,15−4.63−9.51−1.91−0.62−2.31−1.21
MAPE40.5426.9725.3826.8815.477.06