The Portfolio Balanced Risk Index Model and Analysis of Examples of Large-Scale Infrastructure Project
Table 13
Early warning level of project risk index.
| Portfolio balanced risk index | Qualitative description of the project risk severity | Early warning level and coping strategy |
| Above 0.40 | The risk is very serious and the overall value may result in significant loss | Red warning interval, first-grade powerful measures are taken to control and resolve risk | | The risk is comparatively serious and the overall value may result in great loss | Orange warning interval, secondary measures are taken to control and resolve risk | | The risk is generally serious and the overall value may result in great loss | Yellow warning interval, three-grade measures are taken to control and resolve risks | | The risk is comparatively mild and the chance that the overall value deviating from the expected goal is minimal | A relatively safe interval, analyze the cause of risks and verify risk control measures | Below 0.1 | The risk is comparatively mild and the chance of the overall value deviating from the expected goal is very minimal | Safe interval, analyze the cause of risks |
|
|