Research Article
A New Design of Bridge-Subgrade Transition Sections Applied in Beijing-Shanghai High-Speed Railway
Table 3
Correlation Table for Unit Prices of Graded Gravel Transformed before and after improvement.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||
Note: the abnormal mortar can be only used within 2 m from the structure (the large-size machines cannot make roller compaction, so small volumes of filling materials will be used). |