Research Article
Analysis of Constraint-Handling in Metaheuristic Approaches for the Generation and Transmission Expansion Planning Problem with Renewable Energy
Table 16
Expected value of the installed capacity for the conventional candidate energy [MW].
| Scenarios | – | – | – | – | – | – | – | – | Unit | Period |
| | | 0 | 0 | 0 | 0 | 0 | 16.68 | 0 | 20.16 | | | 14.44 | 0 | 0 | 13.91 | 20.79 | 17.47 | 30 | 30 | | | 30 | 15.95 | 15.24 | 30 | 30 | 30 | 28.11 | 23.94 | | | 27.86 | 30 | 30 | 29.96 | 30 | 30 | 30 | 30 | | | 30 | 30 | 30 | 30 | 30 | 30 | 30 | 30 | | | 30 | 30 | 30 | 30 | 30 | 30 | 30 | 30 | | | 30 | 30 | 30 | 30 | 30 | 30 | 30 | 30 | | | 30 | 30 | 30 | 30 | 30 | 30 | 30 | 30 | Expected value of total installed power [MW] | 192.3 | 165.95 | 165.24 | 193.87 | 200.79 | 214.15 | 208.11 | 224.1 |
|
|