Research Article
Analysis of Constraint-Handling in Metaheuristic Approaches for the Generation and Transmission Expansion Planning Problem with Renewable Energy
Table 22
Summary of results for all experiments over case study 1: 3-year period G&TEP problem.
| Strategy | Random initialization | Customized initialization | Best [M] | Distance of the best [M] | of the best | Best [M] | Distance of the best [M] | of the best |
| Unconstrained | 58.6 | 20.3 | 664 | 61.4 | 13.0 | 629 | Strategy 1 | 772.1 | 0.5 | 436 | 740.1 | 0.6 | 419 | Strategy 2 | 77.8 | 0.6 | 436 | 98.9 | 0.5 | 421 | Strategy 3 | 214.3 | 0.6 | 446 | 209.4 | 0.6 | 410 | Strategy 4 | 746.7 | 0.5 | 427 | 773.1 | 0.8 | 422 | Strategy 5 | 83.4 | 2.0 | 452 | 73.1 | 1.9 | 419 | Strategy 6 | 712.8 | 0.02 | 386 | 708.1 | 0.02 | 367 | Strategy 7 | 725.8 | 0.03 | 408 | 721.1 | 0.02 | 379 |
|
|