Research Article
Analysis of Constraint-Handling in Metaheuristic Approaches for the Generation and Transmission Expansion Planning Problem with Renewable Energy
Table 23
Summary of results for all experiments over case study 2: 10-year period G&TEP problem.
| Strategy | Best [billion ] | Distance of the best [billion ] | of the best |
| Unconstrained | 16.1 | 2777.9 | 459,346 | Strategy 1 | 16.3 | 2826.5 | 456,958 | Strategy 2 | 16.3 | 2805.9 | 457,757 | Strategy 3 | 16.3 | 2803.3 | 457,587 | Strategy 4 | 16.2 | 2797.4 | 455,969 | Strategy 5 | 16.3 | 2831.2 | 456,888 | Strategy 6 | 16.2 | 2699.1 | 459,419 | Strategy 7 | 16.2 | 2698.8 | 459,374 |
|
|