Research Article

Analysis of Constraint-Handling in Metaheuristic Approaches for the Generation and Transmission Expansion Planning Problem with Renewable Energy

Table 5

Installed capacity for the candidate conventional energy .

Scenarios
UnitPeriod

00000000
0000100.83100.8347.08047.080
124.96115.94101.48100.9689.1685.80142.91140.67
Total installed power ā€‰124.96115.94101.48100.96190186.63190187.76