Comparison of results based on Taillard’s benchmark instances.

ACO-SAIIGAHMM-PFA
BRDARDBRDARDBRDARD

20 × 5000.280000.0161
20 × 1000.3200.440.01000.021
20 × 2000.4930.560.02000.026
50 × 50.3460.8521.791.340.220.370.888
50 × 100.1450.8852.960.710.040.181.584
50 × 200.0951.7703.180.580.050.372.202
100 × 50.8472.89930.202.780.621.1325.974
100 × 100.6071.78157.231.70.470.9748.559
100 × 200.5991.54661.261.460.410.6973.573
200 × 102.0092.695189.172.491.261.49162.453
200 × 201.6332.190200.822.11.041.35221.214
500 × 202.942.102.31883.166
Average0.5711.40349.8081.199 (1.344)0.374 (0.518)0.595 (0.738)48.774 (118.306)