Research Article
Integrating “Hard” and “Soft” Infrastructural Resilience Assessment for Water Distribution Systems
Table 8
GT measures used to assess the performance criteria according to the TOSE approach.
| | Performance criteria | ROB | RED | RES | RAP |
| TEC | GT(h): 1 − | GT(h): | Monitoring/control systems (0-1) | GT(s): network efficiency | ORG | GT(s): 1 − agent knowledge congruence (WU) | GT(s): out-degree centrality (WU) in A × K | GT(s): cognitive demand (WU) | GT(s): closeness centrality (WU) | SOC | GT(s): capability (C) in A × A | GT(s): hub-centrality (C) in A × A | GT(s): cognitive demand (C) | GT(s): closeness centrality (C) | ECO | GT(h): | GT(s): hub centrality (R3) in R × T | GT(s): capability (R3) in R × T | GT(s): closeness centrality (R3) |
|
|