Research Article

Integrating “Hard” and “Soft” Infrastructural Resilience Assessment for Water Distribution Systems

Table 8

GT measures used to assess the performance criteria according to the TOSE approach.

Performance criteria
ROBREDRESRAP

TECGT(h): 1 − GT(h): Monitoring/control systems (0-1)GT(s): network efficiency
ORGGT(s): 1 − agent knowledge congruence (WU)GT(s): out-degree centrality (WU) in A × KGT(s): cognitive demand (WU)GT(s): closeness centrality (WU)
SOCGT(s): capability (C) in A × AGT(s): hub-centrality (C) in A × AGT(s): cognitive demand (C)GT(s): closeness centrality (C)
ECOGT(h): GT(s): hub centrality (R3) in R × TGT(s): capability (R3) in R × TGT(s): closeness centrality (R3)