Research Article

Redundancy Optimization of an Uncertain Parallel-Series System with Warm Standby Elements

Table 2

Simulation results with a step size of 100 in the UMOM.

Simulation timesReliabilityErrorOptimal solutionRunning time (s)

1000.89050.0268(3,8,8,7,7)0.001629
2000.87700.0403(2,7,7,7,4)0.001390
3000.85810.0592(8,8,8,5,2)0.001055
4000.91010.0027(3,7,7,9,1)0.001457
5000.91730(4,7,8,10,3)0.002060
6000.91010.0027(4,7,7,9,1)0.002060
7000.91010.0027(5,7,8,9,1)0.002025
8000.91730(5,8,7,10,1)0.002624
9000.91010.0027(3,8,9,9,4)0.002737
10000.91730(4,7,8,10,2)0.002670