Research Article

Redundancy Optimization of an Uncertain Parallel-Series System with Warm Standby Elements

Table 3

Simulation results with a step size of 1000 in the UMOM.

Simulation timesReliabilityErrorOptimal solutionRunning time (s)

10000.91730(4,7,8,10,2)0.002670
20000.91730(3,7,7,10)0.004696
30000.91730(4,7,7,10,4)0.006890
40000.91730(4,7,7,10,2)0.009491
50000.91730(3,8,8,10,1)0.007648
60000.91730(3,8,8,10,3)0.009877
70000.91730(5,7,7,10,1)0.013472
80000.91730(3,8,9,10,2)0.013417
90000.91730(3,8,7,10,7)0.014569
100000.91730(4,7,8,10,3)0.015909