Research Article
Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependency
Figure 5
Score trajectories obtained by aggregation operators HA and InducedHA with different configuration of : (a) = 0, (b) = 0.3, (c) = 0.5, (d) = 0.7, (e) = 0.9, and (f) = 1.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |