Research Article

Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependency

Figure 5

Score trajectories obtained by aggregation operators HA and InducedHA with different configuration of : (a) = 0, (b) = 0.3, (c) = 0.5, (d) = 0.7, (e) = 0.9, and (f) = 1.
(a)
(b)
(c)
(d)
(e)
(f)