Research Article

Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependency

Figure 6

Score trajectories obtained by aggregation operators HG and InducedHG with different configuration of : (a) = 0, (b) = 0.3, (c) = 0.5, (d) = 0.7, (e) = 0.9, and (f) = 1.
(a) = 0
(b) = 0.3
(c) = 0.5
(d) = 0.8
(e) = 0.9
(f) = 1