Research Article

Tackling Complexity in Green Contractor Selection for Mega Infrastructure Projects: A Hesitant Fuzzy Linguistic MADM Approach with considering Group Attitudinal Character and Attributes’ Interdependency

Table 9

Order-inducing vectors obtained by our TOPSIS-based method for problem in [38].


0.25220.16290.22820.2714
0.10.52430.13640.4689
0.40810.17560.52440.3779
0.45070.14090.10640.1322
0.06970.22030.37530.1161